Environmental Impact Assessment & Technical Evaluation

Recent Projects

S/N DESCRIPTION OF PROJECT DATE
1 EIA of the Proposed Detergent Factory at Lekki Free Trade Zone for Starium Nig. Ltd Ongoing
2 ESMP for the establishment of PCB analytical laboratory in Sheda Science & Technology Complex (SHESTCO) for UNIDO/FMENv Ongoing
3 National Inventory of PCBs and PCB Containing Equipment in Nigeria for North East (Borno, Taraba, Adamawa, Gombe & Yobe States) and North Central (Kogi, Plateau, Nassarawa and Kwara States) for UNIDO/FMENv Ongoing
4 Line Route, ESIA, ESMP and RAP studies for 330KV WAPP Nigeria-Benin Interconnection Reinforcement Project for WAPP/ECOWAS Ongoing
5 EIA Towards the Design of Polychlorinated Biphenyls (PCBs) Collection, Storage and Treatment Centres in Abuja, Lagos and Enugu States for UNIDO/FMENv Ongoing
6 Line Route Study, ESIA, ESMP and RAP for JICA Financed Transmission Projects in Ogun and Lagos States for JICA/TCN Ongoing
7 Environmental Protection and Rehabilitation Program (EPRP) for BUA Group 2019
8 Environmental & Social Consideration For The Preparation Survey For Power Transmission Project In The Federal Republic Of Nigeria For Yachiyo Engr. Co. Ltd 2019
9 Environmental Protection and Rehabilitation Program (EPRP) for BUA Group 2018
10 LR Review/ESIA/ESMP & RAP for the 14km 330kv Transmission Line in Benin City for TCN 2018
11 High Resolution Satellite Imagery and Feature Extraction software for Right-of-Way Mapping and Property Enumeration for TCN 2018

S/N DESCRIPTION OF PROJECT DATE
12 Assessment/Analysis of COED Nigeria for World Bank 2018
13 Air Quality Dispersion Modeling &Traffic Management Plan for OBU and Electromagnetic Radiation Study for OBU Cement Power Plant (BUA Group) 2018
14 ESIA of Proposed BUA Group Petroleum Refinery in Akwa-Ibom State 2018
EIA of OBU Cement Line 2 and Ikpbobia Limestone Quarry & Conveyor Belt for BUA Group 2018
15 EIA of EMTS BTS Sites for Etisalat Nigeria (9Mobile) 2017
16 EIA for the expansion of Sokoto Cement Plant for CCNN 2017
17 Line Route Study, ESIA/ESMP & RAP for Abuja Feeding Scheme Transmission Project for AFD/TCN 2017
18 ESIA of BUA Rice Mill in Kano and BUA Lafiagi Sugar Company in Lafiagi, Kwara State for BUA Group 2017
19 Environmental Assessment of Oil Spill Site at Km 12.434/Km15.753 Mosimi-Ibadan Pipeline, Odugboro for PPMC 2017
20 EIA Capacity Building for EU-WSSSRP 2 Water and Sanitation Projects in Anambra, Cross-River, Jigawa, Kano, Osun & Yobe states 2016
21 EIA of OBU Cement Water Supply and Support Facility in Okpella for BUA Group 2016
22 Update of Line Route Study, ESIA/ESMP and RAP on 330KVA WAPP North Core Project 2015
23 EIA and Post Impact Assessment Exercise of EMTS BTS Sites for Etisalat Nigeria (9Mobile) 2015
24 EIA of EMTS BTS in 6 Northern States for Etisalat Nigeria (9Mobile) 2014
25 EIA of Expansion of Sokoto Cement Plant for CCNN 2014
26 EIA of CCNN Power Plant Project Sokoto for CCNN 2014
27 EIA of National Automotive Council Automobile Testing Laboratory, Zaria 2012
28 EIA of Etisalat Nigeria (9Mobile) BTS in 17 Northern States 2012
29 Valuation of WSSSRP Water and Sanitation Works in Yobe 2011
30 Assessing the Level of Achievement of WSSSRP Results in Yobe State (Urban Water and Sanitation) 2011
31 EIA for the Establishment of Automotive Testing Laboratories and Administration Blocks in Lagos, Enugu, Zaria 2011
32 EIA of for Etisalat Nigeria (9Mobile) Proposed Base Station Locations 2011
33 EIA of Scrap Metal Recycling and Recovery Plant Tambuwal, Sokoto 2011
34 EIA of Cement Company of Northern Nigeria Quarry Expansion Project 2010
35 EIA of Scrap Metal Recycling and Recovery Plant Kaduna for Enviro Safe 2010
36 Macroeconomic Analysis of the Water Sector in West African Countries for ECOWAS 2009
37 EIA of Proposed Tobacco Services Factory Minna (TSNL) 2009
38 EIA of WSSSRP Projects in Kano, Jigawa and Yobe States 2008
39 EER of NNPC Petroleum Products Retail Outlet, Yola 2008
40 EIA of NNPC Petroleum Products Retail Outlet, Maiduguri 2008
41 EIA of Flow Diversion Structure, Likori for JWL/ITAD 2007
42 EIA of Expansion of Nigerdock Facilities on Snake Island 2006
43 EIA of Integrated Bitumen Development Projects for BEECON 2005
44 EIA of British American Tobacco New Cigarette Factory, Ibadan Nigeria 2003
45 EPIA of Oil Spill from PPMC Pipeline at KM.198 Izon, Niger State got NNPC 2003
46 Review of EIA for Forcados Yokri Integrated Project Federal Ministry of Environment 2002
47 Baseline Studies of Lamurde Local Government Area 2001
48 Review of the Baseline and EIA of Cawthorn/Akaso Integrated Oil Development and Associated Gas Utilization Projects Federal Ministry of Environment 2000
49 Review of EIA for Its Incineration Project for Federal Ministry of Environment 1998
50 Review of EIA & Environmental Audit in Kaduna State for KEPA 1997
HOW TO GET IN TOUCH

CONTACT US


Please feel free to call us for any enquiry any time between 8am and 5pm, Monday to Friday. If you prefer to email us, we'll be sure to respond within 72 hours.

Hours:

Mon-Fri 8am - 5pm

E-Mail:

info@eemslimited.com

Phone:

+243-(0)- 809-420-6008

+243-(0)-809-902-7766

Address:

Operations/Head Office:

No. 5 Eldoret Close, Beside FADAMA House,

Off Aminu Kano Crescent, Wuse 2, Abuja.

Lagos Contact Office:

3, AdekolaBalogun Street, Marwa Bus Stop,

Lekki Phase 1, Lagos State.

SEND EMAIL